Sound Proofing

Noise problems are not just the bane of apartment living. Noise is the fastest growing area of complaint and disputes.

Most detached housing neighbourly complaints are in about unwanted noise. However, apartment living can exacerbate the impact and intrusiveness of any neighbourly. As well there maybe noise from the common property aspects of the building itself, pipe, water, or buildings service.

To prevent this issue, we recommend the use of acoustic cork underlay and we are familiar with working with body corporate buildings, rules and regulations.

Acoustic underlay is designed to isolate tiles from the main structure of the building, reducing sound generated by general footfall.

Interested in this Sound Proofing?

Contact Us Now

Sound Proofing Projects

Sound Proofing Packages

Leaking Shower

  • Remove shower screen
  • Remove shower floor and wall tiles
  • Remove shower screed (sand and cement bed)
  • Supply and install standard waste
  • Waterproof shower floor and shower walls
  • Screed shower floor
  • Supply ceramic pressed edge floor and wall tiles
  • Install tiles to shower floor
  • Install tiles to shower walls
  • Supply and install semi-frameless shower screen
  • Remove and re-install existing taps and shower head

Make Over Package

  • Remove shower screen
  • Remove existing taps, shower head and vanity (bath spout and taps if required)
  • Remove floor and wall tiles and wall sheets where required
  • Re-sheet where required
  • Reuse bath or resurface 
  • Waterproof walls and floor 
  • Supply standard wastes
  • Screed floor
  • Supply ceramic floor and wall tiles
  • Tile floor 
  • Tile walls to required areas (to cover existing heights) 
  • Supply and install semi-frameless shower screen
  • Reinstall existing taps, shower head and vanity (bath spout and taps if required)
  • No painting required 
  • Waterproofing Certificate supplied – Form 16
  • QBCC Home Warranty Insurance taken out on works 

Bathroom Upgrade

  • Remove all fittings and fixtures 
  • Remove mirror
  • Remove vanity
  • Plumbing rough in for new taps/mixers, shower head, vanity, bath etc.
  • Remove all floor and wall tiles
  • Re-sheet where required 
  • Supply standard wastes
  • Waterproof walls and floor 
  • Screed floor
  • Supply ceramic floor and wall tiles
  • Install floor tiles 
  • Install wall tiles to existing heights
  • Supply and install semi-frameless shower screen
  • Supply and install mirror
  • Supply and install required fittings and fixtures
  • No painting required
  • Waterproofing Certificate supplied – Form 16
  • QBCC Home Warranty Insurance taken out on works

Bathroom Renovation

  • Remove all fittings and fixtures
  • Remove all wall and floor tiles, architraves and ceiling 
  • Plumbing rough in for new taps/mixers, new shower head, bath, vanity etc.
  • Move shower waste for strip waste
  • Re-sheet walls, floor and ceiling 
  • Install niche
  • Supply square tile insert waste
  • Supply strip tile insert waste
  • Waterproof walls and floor
  • Screed floor
  • Supply rectified floor and wall tiles
  • Install floor tiles 
  • Install wall tiles to ceiling
  • Ceiling square set or cornice 
  • Replace architraves
  • Paint ceiling & architraves
  • Supply and install semi-frameless or frameless shower screen
  • Supply and install mirror
  • Supply and install new fittings and fixtures
  • Supply and install new vanity
  • Supply and install new bath (if required)
  • Waterproofing Certificate Supplied – Form 16
  • QBCC Home Warranty Insurance taken out on works